1Park, X., Lee, C., Kwon, D, Wang, X. A framework t0r proactive construction defect management using BIM, augmented reality and ontology-based data collection template[J]. Automation in Construction, 2013 (3) 66-71:.
2Hou, L., Wang, X., Wang, J, Truijens, M. An integration framework of advanced technologies for productivity improvement for LNG mega-projects[J]. Journal of Information Technology in Construction, 2014 (19) : 360-382.
3Zhang J, Long Y, Lv S, et al. BIM-enabled Modular and Industrialized Construction in China[J]. Procedia Engineering, 2016 (145) : 1456-1461.