摘要 某水厂原脱水机房为一单层现浇钢筋混凝土框架结构,房屋内有一根断柱且建设时间已达20年。考虑结构整体安全性问题,文章对此房屋进行抗震分析与评估,并对原结构存在的不足提出抗震加固的措施。 Waterworks dewatering room for single-layer Lingqiao reinforced concrete frame structure.There is a broken pillar in the room and the time has been built for 20 years.Taking into account the structure of the overall security issues,in this paper,the seismic evaluation and assessment of the building,and the existing problems of the original structure of seismic reinforcement measures.
作者 李威 陈鹏 LiWei;ChenPeng(Shanghai Municipal Engineering Design and Research General Institute(Group)Co.,Ltd.,Shanghai 200092;Nanjing Jiangbei New District Public works Construction Center,Nanjing,Jiangsu,211800)
出处 《工程技术研究》 2020年第3期27-28,共2页 Engineering and Technological Research
关键词 抗震鉴定 粘钢 加固 水平支撑 anti-earthquake evaluation stick steel reinforce later bracing
  • 相关文献

参考文献4

二级参考文献6

共引文献28

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部