摘要
本文分析成本、应用扩展性、对业主的要求、效益、协调难度和运营支持程度六方面对基于BIM的建设项目管理模式选型的影响,形成共15个评价指标体系,搭建以模糊综合评价方法为筛选方法的一套基于BIM的建设项目管理模式选型体系,并以实际案例验证了该选型体系方法的可行性与有效性,对今后基于BIM的工程项目管理模式评价与决策提供指导意义。
This paper analyzes the influences of factors in six aspects on the mode selection of BIM-based construction project management,including the cost,application scalability,requirements for the owner,benefit,coordination difficulty,and operation support,which forms a total of 15 evaluation index systems to build a BIM based selection system of construction project management mode with fuzzy comprehensive evaluation method as the screening method.Through case studies,the feasibility and effectiveness of the system are verified.The research results of this paper will provide guidance for the evaluation and decision-making of project management mode based on BIM in the future。
作者
王科
Wang Ke(Shanghai Jianke Engineering Consulting Co.,Ltd.,Shanghai 200032,China)
出处
《土木建筑工程信息技术》
2020年第1期117-121,共5页
Journal of Information Technology in Civil Engineering and Architecture
关键词
BIM
管理模式
模糊综合评价方法
评价指标体系
BIM
Management Mode
Fuzzy Comprehensive Evaluation Method
Evaluation Index System