摘要 枢纽内CTCS-3级列控系统是一项集成设计,难以按照常规的技术标准开展列控系统设计,其中尤为突出的是RBC的设置方案,研究枢纽内RBC设置制约因素,对相关的制约因素提出了相应的解决方案,为枢纽RBC设置和列控系统的设计提供思路和方法。 The CTCS-3 train control system in the railway hub is an integrated design,it is difficult to carry out the design in accordance with conventional technical standards,especially the RBC setting scheme design.In this paper the restraining factors were researched and the related solutions against these factors were proposed,it provides ideas and methods for the RBC setting scheme and the design of train control system in railway hub.
作者 池春玲 Chi Chunling(China Railway Siyuan Survey and Design Group Co.,Ltd,Wuhan 430063,China)
出处 《铁路通信信号工程技术》 2020年第3期11-18,共8页 Railway Signalling & Communication Engineering
关键词 无线闭塞中心 制约因素 解决方案 RBC restraining factors scheme
  • 相关文献

参考文献2

二级参考文献10

  • 1中华人民共和国铁道部.科技运[2008]34号C5级列控系统总体技术方案(V1.0)[S].2008.
  • 2中华人民共和国铁道部.铁运[2012]212号无线闭塞中心技术规范(暂行)[S].2012.
  • 3国家铁路局.TBl0621-2014/J1942-2014高速铁路设计规范[S].北京:中国铁道出版社,2014.
  • 4中国铁路总公司.铁总科技[2014]172号铁路技术管理规程[S].2014.
  • 5中华人民共和国铁道部.运基信号[2010]534号TSRS-CTC接口规范(V1.0)[S].2010.
  • 6中华人民共和国铁道部.运基信号[2011]170号C2/C3级列控系统等级转换应用原则(V1.0)[S].2010.
  • 7中华人民共和国铁道部.科技运[2010]21号C3级列控系统应答器应用原则(V2.0)[S].2008.
  • 8石先明.高速铁路CTCS-3级列控系统无线闭塞中心工程设计[J].中国铁路,2009(11):1-6. 被引量:15
  • 9戚书亚.杭长客专引入长沙南枢纽RBC设置方案探讨[J].铁路通信信号工程技术,2013,10(5):7-10. 被引量:3
  • 10池春玲,谢静高.郑州东枢纽RBC设置方案研究[J].铁路通信信号工程技术,2016,13(3):1-7. 被引量:5

共引文献6

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部