国际电站工程EPC总承包项目中的供应链管理 被引量:5

Supply Chain Management in International EPC Power Plant Project
原文传递
导出
摘要 在国际电站工程EPC总承包项目中,采购活动起到了承上启下的作用。对于高端国际电站工程项目的供应链管理,EPC总承包商及其供应商大都需要一个适应的过程。即使是对一个采购订单的管理,都需要环环相扣、多部门多人合作,都需要运用大量的管理工具,以达到一定的管理颗粒度。 In the management of international EPC power plant projects,procurement activities play a role in connecting the preceding activities with the following ones.For the supply chain management in high-end international power plant projects,EPC contractors and their suppliers mostly have a learning curve.Even managing a single purchase order involves interlinked steps,multi-department and multi-person cooperation,and a large number of management tools are needed to achieve a certain degree of management granularity.
作者 王炜正 刘建泉 丁坚 WANG Wei-zheng;LIU Jian-quan;DING Jian(l.China Power Construction Co.SEPCO1II;China Power Construction Co.,International Co.,Ltd;Saudi International Power and Water Company)
出处 《电站系统工程》 2020年第2期75-77,共3页 Power System Engineering
关键词 国际电站工程总承包项目 EPC总承包商 供应链管理(SCM) 供应商管理 采购订单(PO)管理 international EPC power plant project EPC contractor SCM vendor management PO management
  • 相关文献

参考文献1

同被引文献16

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部