摘要
神朔铁路自开行万吨重载列车以来,因操作方法不一致导致的起车失败或者坡起溜逸等事件时有发生,给行车安全带来隐患。文章通过对神朔铁路开行的3+0单元万吨列车在不同线路条件下起车时的各种场景进行分析,结合神朔线路条件、列车牵引制动性能,研究出了适合神朔铁路万吨重载列车的起车操纵办法和注意事项,从而保证列车行车安全,提高行车效率及运输能力。
Since the operation of 10 thousand-ton heavy-duty train of Shenshuo railway,the failure of starting and running on the slope often occurred because of the inconsistent operation methods,which has brought hidden dangers to the safety of driving.In this paper,based on the analysis of various scenarios of 3+0 Unit 10 thousand-ton train running on Shenshuo railway under different line conditions,combined with Shenshuo line conditions and train traction braking performance,the starting operation methods and matters needing attention suitable for ten thousand-ton heavy-duty train of Shenshuo railway are studied,so as to ensure the safety of train operation and improve the driving efficiency and transportation capacity.
作者
陈鹏
刘利
周贤民
CHEN Peng;LIU Li;ZHOU Xianmin(China Energy Group Shenshuo Locomotive Depot of Baoshen Railway,Yulin 719316,China;CRRC Zhuzhou Institute Co.,Ltd,Zhuzhou 412001,China)
关键词
单元万吨列车
组合万吨列车
长大上坡道
牵引力
unit ten thousand-ton train
combined ten thousand-ton train
long large slope
traction