期刊文献+

回采巷道横川拐弯掘进施工工艺应用 被引量:1

Application of the Construction Technology of the Crosscut Corner Driving in the Mining Roadway
下载PDF
导出
摘要 为了解决回采巷道横川拐弯掘进施工时人工清煤的劳动强度大、作业时间长、掘进施工效率低的问题,采用ZCY60R侧卸式装岩机代替人工出煤作业,实现了横川拐弯掘进施工的全程机械化,降低了作业人员的劳动强度,提高了横川拐弯掘进施工效率,减少了回采巷道掘进时间,有效缓解了矿井采掘衔接紧张局面。 In order to solve the problems of high labor intensity,long working time and low efficiency of manual coal cleaning during the construction of hengchuan corner driving in the stope tunnel,ZCY60R side unloading rock loader is used instead of manual coal production,which realizes the whole process mechanization of hengchuan corner driving construction,reduces the labor intensity of the operators,improves the construction efficiency of hengchuan corner driving,and reduces the driving time of mining roadway and effectively relieves the tension of mining connection.
作者 王卫卫 Wang Wei-wei(Shanxi Changping Coal Industry Co.,Ltd.,Shanxi Jincheng 048000)
出处 《山东煤炭科技》 2020年第3期18-19,24,共3页 Shandong Coal Science and Technology
关键词 弯曲 掘进 施工 bend driving construction
  • 相关文献

参考文献5

二级参考文献10

共引文献8

同被引文献19

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部