期刊文献+

赵庄煤业破碎巷帮锚索锚固力提高技术研究 被引量:2

Study on Improving Anchoring Force of Anchor Cable in Broken Roadway of Zhaozhuang Coal Industry
下载PDF
导出
摘要 针对赵庄煤业废弃瓦斯抽放钻孔形成的空洞、小孔径薄浆圈与软煤孔壁摩擦力不足造成锚索锚固力低下、离散度高以及巷帮破碎、锚固力严重不足的问题,设计了巷帮整体注浆加固、全长扩孔孔底加长锚固方案。现场测试10根试验锚索锚固力均达到28MPa以上,巷道两帮和顶板变形量大幅减小,有利于安全使用和采掘衔接。 Aiming at the problems of low anchoring force and high dispersion of anchor cable,as well as the serious shortage of breaking and anchoring force of roadway side caused by the hole formed by waste gas drainage in Zhaozhuang Coal Industry,such as low friction between small aperture slurry ring and soft coal hole wall,a scheme of integral grouting reinforcement of roadway side and lengthening anchoring of full-length reaming hole bottom is designed.In the field test,the anchoring force of 10 test anchor cables is over 28MPa,and the deformation of the two sides of the roadway and the roof is greatly reduced,which is conducive to the safe use and mining connection.
作者 刘许亭 Liu Xu-ting(Zhaozhuang Coal Industry of Jincheng Coal Industry Group,Shanxi Jincheng 048000)
出处 《山东煤炭科技》 2020年第3期28-30,33,共4页 Shandong Coal Science and Technology
关键词 煤巷 破碎 锚固力 注浆 coal roadway broken anchoring force grouting
  • 相关文献

参考文献4

二级参考文献48

共引文献38

同被引文献18

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部