期刊文献+

超临界锅炉水冷壁管变形问题探讨

Study on the Deformation of Water Wall Tube of Supercritical Boiler
下载PDF
导出
摘要 超临界锅炉水冷壁管变形是安装过程中普遍存在的问题,这严重影响了水冷壁的外观质量及使用寿命。分析了造成水冷壁管变形的原因,并针对这些原因提出了相应的措施,为超临界锅炉水冷壁的现场安装提供参考借鉴。 Deformation of water wall tube of supercritical boiler is a common problem that often happens during installation. On some spots with poor management, the deformation is really shocking, which may even reach 160 mm and has a deep influence on the appearance quality and service life of water wall tubes. This paper mainly analyzes various causes of water wall tube deformation and puts forward some corresponding measures according to these causes. These measures can serve as the reference for field installation and the technical assurance for the safe operation ofwater wall tubes.
作者 贾辉 JIA Hui(Shanxi Electric Power Construction,Co.,Ltd.,Taiyuan,Shanxi 030006,China)
出处 《山西电力》 2020年第1期71-72,共2页 Shanxi Electric Power
关键词 超临界锅炉 水冷壁安装 机械变形 焊接变形 平整度 supercritical boiler water wall tube installation mechanical deformation welding deformation flatness
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部