期刊文献+

巴基斯坦瓜达尔港装卸设备的发展路径

Development path of loading and unloading equipment in Gwadar Port of Pakistan
下载PDF
导出
摘要 简要介绍了巴基斯坦瓜达尔港装卸工艺设备的设计、初始的配置、不同码头运营公司对设备的更新、换代。结合目前最先进的装卸设备自动化和智能化发展趋势,对瓜达尔港未来装卸设备的发展路径进行合理地推测。 This paper briefly introduces the design and initial configuration of loading and unloading equipment in Gwadar Port of Pakistan,as well as the equipment renewal and replacement of different terminal operating companies.According to the development trend of automation and intelligence of the most advanced loading and unloading equipment at present,this paper also makes reasonable speculation on the future development path of loading and unloading equipment of Gwadar Port.
作者 肖向东 徐宏斌 Xiao Xiangdong;Xu Hongbin
出处 《起重运输机械》 2020年第2期76-78,共3页 Hoisting and Conveying Machinery
关键词 装卸设备 配置 更新 发展路径 loading and unloading equipment configuration update development path
  • 相关文献

参考文献5

二级参考文献15

  • 1谢云,包起帆,姚振强,葛中雄.外高桥自动化堆场的自动作业装卸系统研究[J].机械设计与研究,2007,23(4):106-108. 被引量:9
  • 2中交第三航务工程勘察设计院有限公司.连云港港庙岭三期突堤工程初步设计[R].上海:中交第三航务工程勘察设计院有限公司,2005..
  • 3中交第三航务工程勘察设计院有限公司.上海国际航运中心洋山深水港区三期工程装卸工艺方案[R].上海:中交第三航务工程勘察设计院有限公司,2006.
  • 4中交第三航务工程勘察设计院有限公司.厦门远海集装箱码头全自动化改造一期工程工程可行性研究报告[R].上海:中交第三航务工程勘察设计院有限公司,2012.
  • 5Mineral potential of Balochistan[R]. Geological Survey of Pakistan, 201 1.
  • 6Gwadar integrated development vision[R]. Government of Balochis- tan and IUCN Pakistan, Balochistan Programme Office, 2010.
  • 7《对外投资合作国别(地区)指南-巴基斯坦(2013年版)》[M].商务部国际贸易经济合作研究院,2013.
  • 8Executive summary of Gwadar master plan[R]. Gwadar Develop- ment Authority, 2012.
  • 9刘畅.《积极发展自动化码头促振华重工转型升级》,中国海事服务网,2014年8月6日.
  • 10葛荣根.《洋山港开建国内首个全自动化集装箱码头》,中国证券网,2014年12月23日.

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部