Erratum to: Big data management in the mining industry
摘要
The original version of this article unfortunately contained two mistakes due to the PDF file conversion through different softwares.The presentation of Figs.2 and 4 was incorrect.The correct versions are given below.
-
1李枢强,Theo Blick.张氏管巢蛛是横列管巢蛛的新名称[J].蛛形学报,2019,28(2):131-131.
-
2Michael M.Murphy,Ted Klemetti,Heather Lawson,Brijes Mishra,Kyle Perry.Guest editorial-special issue on ground control in mining in 2019[J].International Journal of Mining Science and Technology,2020,30(1):1-2.
-
3Jianhang Chen,Fulian He,Shoubao Zhang.A study of the load transfer behavior of fully grouted rock bolts with analytical modelling[J].International Journal of Mining Science and Technology,2020,30(1):105-109. 被引量:10
-
4Samiramis Nasirimoghaddam,Ali Mohebbi,Mohsen Karimi,M.Reza Yarahmadi.Assessment of pH-responsive nanoparticles performance on laboratory column flotation cell applying a real ore feed[J].International Journal of Mining Science and Technology,2020,30(2):197-205. 被引量:22