摘要
水利工程由土建施工和机电设备组合而成,同时前者为后者服务,为确保工程质量和预期任务的完成,要在实际动工中加大二者间的协调力度。本文就水利工程中土建施工和机电设备安装的问题加以探讨,给出解决这一问题的对策,确保水利工程的高效及工程质量。
Water conservancy project is composed of civil construction and mechanical and electrical equipment,while the former serves the latter.In order to ensure the project quality and expected completion within the specified time limit,it is necessary to increase the coordination between the two in the actual construction.This paper discusses the problems of civil construction and mechanical and electrical equipment installation in water conservancy project,and gives the countermeasures to solve this problem,so as to ensure the high efficiency and quality of water conservancy project.
作者
谢志
XIE Zhi(China Water Conservancy and Hydropower Eighth Engineering Bureau Co.,Ltd.,Changsha Hunan 410000)
出处
《智能建筑与工程机械》
2019年第2期15-16,19,共3页
Intelligent Building and Construction Machinery
关键词
水利工程
机电设备安装
土建施工
协调配合
water conservancy project
mechanical and electrical equipment installation
civil construction
coordination and cooperation