摘要 西安市北辰大道主线落地平行匝道桥快速化改造过程中,为加快施工进度,采用了钢箱梁结构进行施工。针对该工程面临的钢箱梁自重大、桥面跨度大、工期紧以及施工作业面邻近330 kV高压电塔等问题,制定了专项施工方案,解决了钢箱梁制作安装、临时支架设计、高压电塔处施工处理等过程中的难点,取得了良好的改造效果,亦为类似项目积累了经验。 To speed up the construction progress, the steel box girder structure is used in the rapid reconstruction of the parallel ramp bridge on the main line of Beichen Avenue in Xi’an. In view of the problems of the project, such as the large dead-weight of the steel box girder, the large span of the bridge deck, the tight construction period, and the construction working face adjacent to the 330 kV high-voltage tower, a special construction scheme is formulated to solve the difficulties in the process of the production and installation of the steel box girder, the design of temporary support, and the construction treatment at the high-voltage tower. Good results are achieved and the experience is accumulated for similar projects.
作者 冯战坤 FENG Zhankun(SCEGC Mechanized Construction Group Company Ltd.,Xi’an,Shaanxi 710032,China)
出处 《建筑施工》 2020年第3期423-424,430,共3页 Building Construction
关键词 道路快速化改造 钢箱梁匝道桥 临时支架 施工方案 road rapid reconstruction steel box girder ramp bridge temporary support construction scheme
  • 相关文献

参考文献5

二级参考文献12

共引文献8

同被引文献27

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部