3Vandecasteele C, van der Sloot H. Sustainable Management of waste and recycled materials in construction[ J]. Waste Management,2011, 31 (2) :199 -200.
4Seadon J K. Sustainable waste management systems [ J ]. Journal of Cleaner Production,2010,18(16/17) :1639 - 1651.
5Zhao W, Leeftink R B, Rotter V S. Evaluation of the economic feasi- bility for the recycling of construction and demolition waste in China - the case of Chongqing [ J ]. Resources, Conservation and Recy- cling,2010,54(9) :377 -389.
6Knoeri C, Binder C R, Althans H J. Decisions on recycling: Construc- tion stakeholders' decisions regarding recycled mineral construction materials [ J ]. Resources, Conservation and Recycling, 2011, 55 ( 17 ) : 1039 - 1050.
7Begum R A, Siwar C, Pereira J J, et 81. Attitude and behavioral factors in waste management in the construction industry of Malaysia [ J ]. Resources, Conservation arid Recycling,2009,53 ( 6 ) :321 - 328.
8da Rocha C G, Sattler M A. A discussion on the reuse of building components in Brazil: An analysis of major social, economical and legal factors [ J ]. Resources, Conservation and Recycling, 2009,54 (9) :104 - 112.
9Duran X, Lenihan H, O'Regan B. A model for assessing the econom- ic viability of construction and demolition waste recycling: the case of Ireland [ J ]. Resources, Conservation and Recycling,2006,46 ( 12 ) : 302 - 320.
10Soerholm P,Tilton J E. Material effficiency:An economic perspective [ J]. Resources, Conservation and Recycling,2012,61 ( 11 ) :75 - 82.