摘要
目前,我国大部分火电机组的调峰范围是50%~100%额定负荷,随着各地区并网发电厂辅助服务管理实施细则的发布,深度调峰对于火力发电厂越来越重要。文章针对660MW火电机组在深度调峰中协调控制技术进行了深入研究,提出了一套协调控制策略优化措施,并在福建华电邵武项目新建4号机组进行了35%~100%额定负荷的AGC协调变负荷试验,结果表明,该协调控制策略切实可行。
At present,the peak-shaving range of most thermal power units in China is 50%-100% rated load.With the release of the implementation rules of auxiliary service management for grid connected power plants in various regions,deep peak-shaving is becoming more and more important for thermal power plants.This paper has conducted in-depth research on the coordinated control technology of 660MW thermal power unitin deep peak-shaving,a proposed a set of coordinated control strategy optimization measures,and conducted 35%-100% rated load AGC load change test at Unit 4 in Fujian Huadian Shaowu project.The test results show that the proposed coordinated control strategy is feasible.
作者
陈超
CHEN Chao(China Energy Engineering Group Central China Electric Power Test and Research Institute Co.,Ltd,Changsha 410000,China)
关键词
火电机组
深度调峰
协调控制
thermal power unit
deep peak-shaving
coordinated control