摘要 在建的道吾山隧道为单洞三车道特长一级公路隧道,洞口Ⅴ级围岩浅埋段开挖跨径16.85 m,开挖面积163.55 m2,原设计采用双侧壁导坑法施工,变更后采用三台阶七部法施工。通过三维数值模拟分析,以及施工过程中对隧道拱顶下沉、净空收敛,初期支护结构受力状况进行分析,判断围岩稳定性、初期支护结构安全。数值计算结果表明:三台阶七部法施工运用在三车道隧道Ⅴ级洞口浅埋段是安全的。研究结果可为类似工程设计和施工提供依据和参考。 The Daowu Mountain tunnel under construction is a 3-lane super-long first grade highway tunnel.The excavation span in shallow section of grade V surrounding rock at the portal of the tunnel is 16.85 m,and the excavation area is 163.55 m 2.The original design construction method was both side heading method and three-step seven-part method was adopted after design changes.Through three-dimensional numerical simulation analysis,the vault settlement,clearance convergence and the initial support stress during construction was analyzed to judge the stability of surrounding rock and initial support safety.The numerical results show that the three-step seven-part construction method is safe in shallow portal part of grade V surrounding rock for the 3-lane tunnel.The results could provide basis and reference for similar design and construction.
作者 邹永艳 胡达 ZOU Yong-yan;HU Da(Central South Survey Design Institute Group Co.,Ltd.,Wuhan 430064,China;China Highway Engineering Consultants Corporation,Beijing 100089,China)
出处 《科学技术与工程》 北大核心 2020年第6期2464-2469,共6页 Science Technology and Engineering
关键词 道吾山隧道 三车道公路隧道 洞口浅埋 三台阶七部法 Daowu Mountain tunnel 3-lane highway tunnel shallow portal three-step seven-part method
  • 相关文献

参考文献8

二级参考文献61

共引文献81

同被引文献20

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部