摘要
介绍了生活垃圾焚烧发电厂的通风、空调和供暖设计思路。重点说明了垃圾池间增大排风量和减少进风量的防臭措施。分析了垃圾池间、锅炉间等的排烟系统设计难点,建议锅炉间等大面积的丁类高大空间生产车间不设置排烟系统。
Presents the ventilation,air conditioning and heating design in municipal solid waste incineration power plants.Emphasizes the deodorant measure to increase the exhaust air rate and reduce supply air rate in the garbage pool rooms.Analyses the smoke exhaust system design difficulties of the garbage pool rooms and the boiler rooms,and concludes that there is no need to install smoke exhaust system in type D large space production workshops,such as boiler rooms.
作者
方斌东
邹昊舒
冯旭东
冯志翔
王纯
高一文
Fang Bindong;Zou Haoshu;Feng Xudong;Feng Zhixiang;Wang Chun;Gao Yiwen(China United Engineering Co.,Ltd.,Hangzhou,China;不详)
出处
《暖通空调》
2020年第3期44-48,共5页
Heating Ventilating & Air Conditioning
关键词
垃圾焚烧发电厂
空调
供暖
防臭设计
防雾
排烟
通风
waste incineration power plant
air conditioning
heating
deodorant design
antifog
smoke exhaust