摘要
基于对工程索赔时效的研究,首先,阐述时效基本内容。然后,分析工程索赔产生的原因,包括工程项目参建单位多元性、工程项目环境的多变性。最后,为使得工程索赔时效性得到保障,给出监督权利人积极索赔、加强双方利益的平衡、确保索赔时效、加强工作队伍建设工作等措施。
Based on the research on the limitation of engineering claims,first,the basic content of limitation is explained.Then,the reasons for the engineering claims are analyzed,including the diversity of the units participating in the project and the variability of the project environment.Finally,in order to ensure the timeliness of project claims,measures such as monitoring the right holder's active claims,strengthening the balance of the interests of both parties,ensuring the timeliness of claims,and strengthening the workforce construction are provided.