长输管道压气站建设项目实施阶段工程投资控制研究 被引量:5

Research on Project Investment Control of Long-distance Pipeline Compressor Station Construction Project in the Implementation Phase
下载PDF
导出
摘要 压气站是天然气管道输送系统的“动力心脏”,具有工艺设计复杂、质量要求高、投资额度大等特点,决定其建设项目实施阶段的投资控制难度大。为实现工程投资的有效控制,对设计方案、采购方案、施工工期和试运方案等影响工程投资的主要因素进行分析,并提出重视量化分析、推进设计优化、加强采购管理、优化施组设计和论证试运方案等投资控制具体措施。 The compressor station is the"power heart"of the natural gas pipeline transportation system.It has the characteristics of complex process design,high quality requirements,and large investment quotas.In order to achieve effective control of engineering investment,this paper analyzes the main factors affecting engineering investment such as design plan,procurement plan,construction period and trial operation plan,and puts forward specific investment control measures such as quantitative analysis,advancing design optimization,strengthening procurement management,construction design and demonstration of trial operation plan.
作者 张朋程 ZHANG Peng-cheng(Engineering Cost Center of Sinopec Petroleum Engneering Corporation,Dongying 257026,China)
出处 《价值工程》 2020年第7期139-141,共3页 Value Engineering
关键词 投资控制 工程投资 实施阶段 压气站 长输管道 investment control project investment implementation phase compressor station long-distance pipeline
  • 相关文献

参考文献3

二级参考文献5

共引文献3

同被引文献22

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部