黄土隧道施工过程中的沉降变形控制 被引量:3

Controlling the Settlement and Deformation During the Construction of Loess Tunnels
下载PDF
导出
摘要 结合蒙西至华中地区铁路煤运通道工程银山2号隧道具体工程特点,针对黄土隧道的特性,采取切实可行的支护参数和施工工艺,探讨施工过程中控制沉降变形的措施,从而达到施工工程中控制地表及拱顶沉降的目的。 Combining the specific engineering characteristics of Yinshan No.2 tunnel with the railway coal transportation channel project from Mengxi to Central China, according to the characteristics of the loess tunnel, practical support parameters and construction techniques are adopted to discuss measures to control settlement and deformation during construction, in order to control ground and vault settlement during construction.
作者 李智 LI Zhi(The 2nd Engineering Co.Ltd.of China Railway 17 Bureau Group Corporation,Xi'an 710115,China)
出处 《工程建设与设计》 2020年第6期92-93,共2页 Construction & Design for Engineering
关键词 软弱围岩 施工控制 沉降控制 weak surrounding rock construction control settlement control
  • 相关文献

参考文献1

二级参考文献10

共引文献43

同被引文献16

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部