庙沟铁矿露天转地下工程主井660V临时供电线路因需要增设大功率用电设备,导致原有供电线路电缆无法满足负荷要求,特进行线路改造以满足供电负荷需求。
Temporary power supply line for Miaogou iron ore mine project transitioning from open pit mining to underground mining is 660V.Addition of high power equipment results in inability of the existing power supply line to satisfy load requirements.Therefore,line reconstruction is done to satisfy the load requirements.
作者
刘银海
戚力林
孟欣
张贺
LIU Yinhai;QI Lilin;MENG Xin;ZHANG He(Miaogou Iron Ore Mine of HBIS Mining Co., Ltd, Qinhuangdao 066000, China)
出处
《矿业工程》
CAS
2020年第1期66-67,共2页
Mining Engineering
关键词
临时供电
线路优化
电缆选型
temporary power supply
line optimization
cable selection