摘要
对万家寨引黄工程GM3泵站6500kW大泵电机的研制情况进行了详细分析。主要介绍了电机的电磁、结构、刚强度计算和通风计算等部分。通过对此电机的研制,熟悉并掌握了此类电机的设计和分析计算方法,为同类型电机的设计提供了一些有益的参考。
The research and development of 6500kW large pump motor in GM3 pump station of Wanjiazhai Yellow River Diversion Project is introduced in detail,and the electromagnetic design,structural design,rigidity and strength calculation as well as ventilation calculation of the motor are mainly introduced.Through research and development of this type of motor,the design and analysis calculation methods of this kind of motors are known and mastered,which provide some useful references for the design of same type of motors.
作者
王涛
李海鹏
徐立敏
Wang Tao;Li Haipeng;Xu Limin(Harbin Electric Power Equipment Co.,Ltd.,Harbin 150000,China)
出处
《防爆电机》
2020年第1期21-24,共4页
Explosion-proof Electric Machine
关键词
起动
结构
刚强度
通风
Starting
structure
rigidity and strength
ventilation