期刊文献+

海工用X100管线钢管的焊接工艺及接头质量分析

Analysis of welding process and joint quality of X100 pipeline steel pipe for marine engineering
下载PDF
导出
摘要 采用海洋平台建造中符合AWS D1.1标准的6GR位置特定坡口形式,利用焊条电弧焊(SMAW)单面焊双面成形工艺焊接某国产X100管线钢管。通过拉伸、冲击、弯曲试验检测接头的力学性能,通过光学显微镜对比分析X100管线钢焊接接头坡口两侧熔合线显微组织。结果表明,该公司生产上所用的X100管线钢管在6GR位置通过合适的预热及焊接热输入可以得到满足结构使用性能要求的焊接接头,但接头未开坡口侧在-40℃冲击时,冲击吸收能量相对较低,原因是未开坡口侧(直边)熔合线晶粒粗化严重,大晶粒晶界有相互连接趋势。 Single-side welding by shielded metal arc welding with the inevitable 6GR position and specific groove form(comply with AWS D1.1)in the offshore platform construction was used to weld domestic X100 pipeline steel pipe.The mechanical properties of the welded joints were measured by tensile strength,impact toughenss,bending test and the microstructures of the fusing area on both sides of the X100 pipeline steel welded joint were analyzed by optical microscope.The results shown that the X100 pipeline steel pipe used in the production of the company could be welded and the weld joint could satisfy the structural performance requirement with appropriate preheating and welding heat input control in the 6GR position.But the impact absorbed energy was relatively low on the unbevel side of the welded joint in the-40℃impact test.The reason is that the grain size coarsened severely and the boundary of the large grains have a mutual connection trend in the fusion area of the unbevel side(square side).
作者 冯胜昆 周文 张徐强 屈江艳 Feng Shengkun;Zhou Wen;Zhang Xuqiang;Qu Jiangyan(China Merchants Heavy Industry(Jiangsu)Co.,Ltd.,Nantong 226116,China)
出处 《机械制造文摘(焊接分册)》 2020年第1期18-22,共5页 Welding Digest of Machinery Manufacturing
关键词 X100管线钢管 6GR位置 预热 未开坡口侧 晶界 X100 pipeline steel pipe 6GR position preheating unbevel side grain boundary
  • 相关文献

参考文献6

二级参考文献64

  • 1黄维,张志勤.欧洲海洋平台用厚板品种及工艺的发展[J].建筑钢结构进展,2012,14(6):8-13. 被引量:13
  • 2黄开文.X80和X100钢级管线钢的合金化原理和生产要点[J].轧钢,2004,21(6):55-58. 被引量:37
  • 3郑磊,傅俊岩.高等级管线钢的发展现状[J].钢铁,2006,41(10):1-10. 被引量:132
  • 4郑磊 高珊 陈钰珊.宝钢管线钢的开发与应用[J].钢铁,2002,37:417-421.
  • 5Asahi H,Hara T,Tsuru E,et al.Development of Ultra HighStrength Linepipe X120[J].Nippon Steel Technical Report,2004,(90):70-75.
  • 6Hillenbrand H G,Kalwa C.Production and Service Behavior of High Strength Large Diameter Pipes[A].Toyoda M,Denys Reds.Proceedins of International Conference on the Application and Evaluation of High-Grade Linepipes in Hostile Environments[C].Yokohama,Japan:Scientific Surveys Ltd.,2002.203-215.
  • 7Hulka K,Gray J M.High Temperature Processing of Line Pipe Steels[A].TMS eds.Proceedings of the International Symposium Niobium 2001[C].Oriando,Florida,USA:2001.587-612.
  • 8Stalheim D G.The Use of High Temperature Processing (HTP) Steel for High Strength Oil and Gas Transmission Pipeline Application[J].Iron & Steel,2005,40 (Supplement):699-704.
  • 9Hashimoto Y,Komizo T,Tsukamoto M,et al.Recent Development of Large Diameter Line Pipe (X80 and X100 Grade)[J].The Sumitomo Search,1988,37:93-104.
  • 10Petersen C W,Corbett K T,Fairchild D P,et al.Improving Long-Distance Gas Transmission Economics:X120 Devlopment Overview[A].Denys Reds.Proceedings of the 4th International Pipeline Technology Conference[C].Ostend,Belgium:Scientific Surveys Ltd.,2004.3-30.

共引文献198

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部