既有接触网七跨分相改八跨分相施工技术探讨 被引量:1

Discussion on OCS Construction Technology for Modification of Existed 7-span NeutralSection into 8-span Neutral Section
下载PDF
导出
摘要 结合包西线牵引供电设施改造工程施工实践,分析既有接触网七跨分相改八跨分相深层次原因,针对包西线客货运行情况,明确改造施工范围,提出可行的改造施工方案,并对改造施工方案的优势及创新点进行分析,全面总结了施工经验,希望为类似工程提供参考。 With reference of construction practices for reconstruction project of traction power supply facilities of Baotou-Xi’an railway,the paper analyzes the underlying causes for modification of existed OCS 7-span neutral section into 8-span neutral section,and with regard to the passenger and freight traffic status on Baotou-Xi’an railway,defines clearly the reconstruction scope,proposes the feasible reconstruction scheme,analyzes its advantages and innovation points,summarizes thoroughly the construction experience,hoping to provide references for the similar projects in the future.
作者 高兵 GAO Bing
出处 《电气化铁道》 2020年第1期81-84,共4页 Electric Railway
关键词 接触网 分相改造 三机重联 OCS reconstruction of neutral section three-locomotive operation
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部