期刊文献+

深圳国际会展中心项目99m弧形倒三角桁架制作及预拼装技术 被引量:3

Production and Pre-assembly Technology of 99m Heavy Truss of Shenzhen International Convention and Exhibition Center Project
下载PDF
导出
摘要 针对深圳国际会展中心大截面、大吨位、多节点屋盖桁架,制定合理的制作及预拼装工艺。通过桁架杆件加工精度控制技术、弧形弯管制作技术、折弯节点制作技术,确保桁架构件加工质量满足规范要求。通过桁架圆口错边纠正技术,解决弦杆错边问题。按地样制作、胎架设计、上弦杆安装、水平腹杆安装、下弦杆安装、斜腹杆安装、整体验收的加工顺序,完成99m重型桁架预拼装。 A reasonable fabrication and pre-assembly process for the large cross-section,large tonnage and multi-node roof trusses of Shenzhen International Convention and Exhibition Center was developed.The processing quality of truss members could be ensured to meet the specification requirements through the processing precision control technology of truss members,the control technology of arc bending and the manufacture technology of bending joints.The problem of wrong side of chord was solved through the technique of correcting wrong side of circular mouth of truss.Pre-assembly of 99m heavy truss was completed according to the processing order of ground sample making,tire frame design,upper chord installation,horizontal chord installation,lower chord installation,oblique chord installation and overall acceptance.
作者 王志强 许帅 杨高阳 李定山 周俊杰 柳京 WANG Zhiqiang;XU Shuai;YANG Gaoyang;LI Dingshan;ZHOU Junjie;LIU Jing(China Construction Science and Industry Co.,Ltd.,Shenzhen,Guangdong 518040,China;Wuhan Branch of China Construction Steel Structure Co.,Ltd.,Wuhan,Hubei 430000,China)
出处 《施工技术》 CAS 2020年第4期91-93,共3页 Construction Technology
基金 国家重点研发计划(2019YFB1312205)。
关键词 钢结构 安装工程 大跨度 桁架 预拼装 节点 施工技术 steel structures installation large span trusses pre-assembly joints construction
  • 相关文献

参考文献5

二级参考文献17

共引文献32

同被引文献17

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部