期刊文献+

云南水利工程设计概算编制要点分析 被引量:1

Analysis on the Organization Points of Water Conservancy Design Personnel in Yunnan Province
下载PDF
导出
摘要 以目前云南省最新发布的水利工程相关营改增文件及水利工程概算定额为主要依据,结合云南省水利工程的实际情况,从编制依据的确定及了解工程基本情况开始,逐步分析一个完整的设计概算在编制过程中关于人材机、直接费费率、间接费费率等基础资料在选择运用时应注意的要点,同时为编制云南省水利工程设计概算的造价人员提供参考。 According to the latest documents of replacing business tax with VAT related to water conservancy projects issued by Yunnan province and the estimated cost quota of water conservancy projects as the main basis,Combined with the actual situation of water conservancy project in Yunnan province from the compilation basis determine and understand the project basic situation,analysis of a complete design step by step in the process of compiling about talent machine,direct fee rate,basic data,such as the indirect cost rate should be paid attention to when choosing to use the main points of the problem,so that to prepare the Yunnan province of water conservancy engineering design personnel to provide a reference.
作者 王倩茜 WANG Qianxi(Northwest Engineering Corporation Limited,XI’an 710065,China)
出处 《工程经济》 2020年第2期49-54,共6页 ENGINEERING ECONOMY
关键词 云南省 水利工程 概算编制 yunnan province Water conservancy project designing budget estimate
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部