地铁隧道联络线下穿游泳池施工技术方案研究 被引量:1

Study on construction technology scheme of subway tunnel connecting line passing through swimming pool
下载PDF
导出
摘要 以长春地铁1号、2号线联络线暗挖隧道施工为背景,阐述环形非标准断面联络线隧道266.35 m范围内下穿游泳池施工风险及技术难点,经对“深孔注浆(WSS)+横向支撑”和“全断面注浆+拱部150°双排超前小导管+横向支撑”2种方案进行综合对比分析,最终确定联络线施工采取“全断面注浆+拱部150°双排前小导管+横向支撑”加固技术方案,该方案可有效、可靠地保障联络线隧道施工和游泳池的结构安全。 Based on the background of the underground tunnel construction of Changchun metro line 1 and line 2,this paper expounds the circular non-standard cross section connecting line tunnel 266.35m.Through the comprehensive comparative analysis of two schemes of Deep Hole Grouting(WSS)+Horizontal Support and Full Section Grouting+Arch 150°Double Row Leading Small Conduit+Horizontal Support,it is determined that the technical scheme of Full Section Grouting+Arch 150°Double Row Front Small Conduit+Horizontal Support reinforcement is used for the construction of connecting line,which is effective and feasible.The construction of the connecting line tunnel and the structure of the swimming pool are guaranteed.
作者 鲁亚朋 Lu Yapeng
出处 《现代城市轨道交通》 2020年第4期45-48,共4页 Modern Urban Transit
关键词 地铁 联络线 隧道下穿 施工方案 subway connecting line tunnel underpass construction scheme
  • 相关文献

参考文献11

二级参考文献39

共引文献222

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部