摘要
在超高层建筑施工中,常用到液压爬模和塔吊,二者在平面布置和爬升流程布置上存在相互冲突的隐患。以上海国际金融中心工程为例,浅析在方案设计阶段,如何做好二者的协调设计,将问题解决在施工前,对于超高层施工的顺利施工非常重要。
Hydraulic climbing mold and tower crane are commonly used in the construction of super-high-rise buildings,existing risks of conflicts in the layout and the climbing process.Taking the Shanghai International Financial Center project as an example,this paper analyzes how to do a good job in the schematic design phase,how to solve the problem before the construction,it is very important for smooth construction of super-high-rise construction.
作者
谢业桂
杨德生
Xie Yegui;Yang Desheng(Shanghai National Nuclear Puyuan Co.,Ltd.,Shanghai 200233,China;Shanghai Construction Group,Shanghai 200000,China)
出处
《山西建筑》
2020年第8期88-89,共2页
Shanxi Architecture
关键词
超高层建筑
液压爬模
塔吊
防冲突设计
super high-rise building
hydraulic climbing formwork
tower crane
collision design