期刊文献+

超高层建筑核心筒施工液压爬模与塔吊防冲突设计 被引量:3

Anti-conflict design for hydraulic climbing mold and tower crane in the construction of super-high-rise buildings
下载PDF
导出
摘要 在超高层建筑施工中,常用到液压爬模和塔吊,二者在平面布置和爬升流程布置上存在相互冲突的隐患。以上海国际金融中心工程为例,浅析在方案设计阶段,如何做好二者的协调设计,将问题解决在施工前,对于超高层施工的顺利施工非常重要。 Hydraulic climbing mold and tower crane are commonly used in the construction of super-high-rise buildings,existing risks of conflicts in the layout and the climbing process.Taking the Shanghai International Financial Center project as an example,this paper analyzes how to do a good job in the schematic design phase,how to solve the problem before the construction,it is very important for smooth construction of super-high-rise construction.
作者 谢业桂 杨德生 Xie Yegui;Yang Desheng(Shanghai National Nuclear Puyuan Co.,Ltd.,Shanghai 200233,China;Shanghai Construction Group,Shanghai 200000,China)
出处 《山西建筑》 2020年第8期88-89,共2页 Shanxi Architecture
关键词 超高层建筑 液压爬模 塔吊 防冲突设计 super high-rise building hydraulic climbing formwork tower crane collision design
  • 相关文献

参考文献2

二级参考文献6

同被引文献9

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部