摘要
济南东站屋盖为全覆盖复杂双曲面落地拱结构体系,屋盖跨度为122~156m,长度为406.6m。为满足建筑构想,通过线型比选确定抛物线作为双曲面的线型,采用数学解析方程定义双曲面抛物线拱。考虑技术指标以及经济性,对比了屋盖4种支撑体系,最终确定了10.2m标高处增加立柱方案。分析表明屋盖结构的稳定满足规范要求,结构刚度较大,用钢量指标经济性较好。该方案屋盖最大跨度为156m,刷新了国内高铁客站的结构跨度,为以后类似高铁客站屋盖结构的设计提供了参考。
The roof of Jinan East Railway Station is a fully covered complex hyperboloid linked-to-ground arch structural system,with a roof span of 122~156m and a length of 406.6m.In order to satisfy the architectural conception,parabola was determined as hyperbolic line type by line type comparison and selection,and hyperbolic parabola arch was defined by mathematical analytic equation.Considering the technical index and economy,four kinds of roof supporting systems were compared,and the scheme of adding columns at the elevation of 10.2m was finally determined.The analysis shows that the stability of the roof structure meets the requirements of the code,the structural rigidity is large,and the steel consumption index is economic.In this scheme,the maximum span of the roof is 156m,which refreshes the structural span of domestic high-speed railway passenger station,and provides a reference for the design of similar high-speed railway passenger station roof structure in the future.
作者
余洋
翁凯
宋志文
马明
汤理达
张高明
Yu Yang;Weng Kai;Song Zhiwen;Ma Ming;Tang Lida;Zhang Gaoming(China Railway Design Corporation,Tianjin 300251,China;China Academy of Building Research,Beijing 100013,China;MAP3,Beijing 100125,China)
出处
《建筑结构》
CSCD
北大核心
2020年第5期77-81,共5页
Building Structure
基金
中国铁路设计集团有限公司科技开发课题( 721759, 721760) 。
关键词
济南东站
复杂双曲面
结构跨度
数学解析
方案比选
Jinan East Railway Station
complex hyperboloid
structural span
mathematical analysis
scheme comparison and selection