摘要
北京新机场项目采光顶外形变化多样、系统构造复杂,且与排水天沟相互衔接,其防水设计遵循"从原理出发,结合材料特性,防水与排水相结合"的基本理念,以"完全密封"为基础,局部辅以"收集储存"的主动防水方式,取得了较好的防水效果。本文着重介绍了该屋面天沟的防水做法,并对各系统防水重难点进行了分析。
The shape of lighting roof of Beijing New Airport Project varies widely and the system structure is complex,at the same time,it is connected to the drainage gutter.Its waterproofing design follows the basic concept of"starting from principle,combining with material characteristics,combining waterproofing and drainage",based on"completely sealed"and partially supplemented with"collection and storage"active waterproofing method,which achieves better waterproofing effect.This article focuses on the waterproofing method of the roof gutter,and analyzes the waterproofing difficulties of each system.
作者
杨俊
王继惠
张海波
Yang Jun;Wang Jihui;Zhang Haibo(Shenzhen Sanxin Technology Development Co.,Ltd.,Shenzhen,Guangdong 518000,China)
出处
《中国建筑防水》
2020年第4期23-26,共4页
China Building Waterproofing
关键词
北京新机场
采光顶
天沟
密封胶
TPO防水卷材
防水设计
Beijing New Airport
lighting roof
gutter
sealant
TPO waterproofing membrane
waterproofing design