摘要
近年来,随着园林景观行业的不断发展,EPC模式凭借其管理效率高专业联系紧密的特点,能够及时把控项目整体情况,有条不紊地推进项目进程,成为备受建设单位青睐的运行模式。全南县大广高速出入口及县城重要节点绿化景观工程是典型的EPC园林景观工程,以该项目为分析点,探究EPC项目的发展前景以及实施过程中设计与施工过程磨合的途径。
In recent years,with the continuous development of the landscape industry,EPC model,with its high management efficiency and close professional ties,can control the overall situation of the project in time and advance the project process in an orderly manner,it has become the favored operation mode of construction units.The green landscape engineering of the entrance and exit of Daiko Advertising expressway and the important nodes of county town in the whole Nan County is a typical landscape engineering of EPC,the development prospect of EPC project and the way of running-in between design and construction process are explored.
出处
《中外建筑》
2020年第2期156-158,共3页
Chinese & Overseas Architecture
关键词
设计与施工
项目管理
园林景观工程
design and construction
project management
landscape engineering