富水弱成岩地层铁路隧道基底软化处治技术 被引量:2

Technology of Railway Tunnel Inverted Arch Weak Foundation Treatment in Watery Weakly Consolidated Stone
下载PDF
导出
摘要 某铁路隧道穿越主要地层为侏罗系砂岩、泥岩,其中砂岩为主要含水层,泥质胶结,成岩作用差,胶结强度低,遇水浸泡极易软化崩解,导致在隧道施工过程中存在拱脚掏空、基底软化等问题,造成施工困难,施工进度缓慢。针对本地层特点主要采取了洞内降水、基底换填、基底排水等一系列措施,保证了隧道安全有序的贯通。 The main strata which the railway tunnel passes through are Jurassic sandstone and mudstone.Sandstone.is the main aquifer with poor diagenesis and low cementation strength,It is easy to soften and disintegrate when soaked in water.As a result,problems such as hollowing of arch foot and inverted arch softening exist in the process of tunnel construction,which resulted in construction difficulties and slow construction progress.According to the characteristics of the local layer,a series of measures such as precipitation in cave,inverted arch replacement and inverted arch drainage are taken to ensure the safe and orderly connection of the tunnel.
作者 张磊 ZHANG Lei(Xinjiang Railway Survey&Design Institute Co.,Ltd.,China Railway First Survey&Design Institute Group Co.,Ltd.,Urumqi 830011,China)
出处 《粉煤灰综合利用》 CAS 2020年第2期69-71,76,共4页 Fly Ash Comprehensive Utilization
关键词 富水弱成岩 铁路隧道 基底软化 处治技术 fwatery weakly consolidated stone railway tunnel inverted arch weak foundation treatment technology
  • 相关文献

参考文献11

二级参考文献92

共引文献109

同被引文献21

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部