唐山港曹妃甸港区矿石码头三期工程码头平面布置 被引量:2

Plane Layout of Ore Terminal Phase-3 Project at Caofeidian Harbor of Tangshan Port
下载PDF
导出
摘要 针对曹妃甸矿石码头三期工程,通过数学模型和物理模型试验,合理确定码头方位和长度。并针对船舶横移量较大的问题,对系缆墩的布置进行优化,减少了风、浪、流组合作用下船舶运动量对装卸作业的影响,且缆绳的受力更加均匀。 In ore terminal Phase-3 project at Caofeidian harbor,the mathematical and physical models are used to determine the rational position and berth length of the terminal.In order to solve the problem of much more transverse distance of vessels,the layout of mooring piers is optimized to reduce the impact of vessels’motion on the load/unload operation under the combined action of wind,wave and ocean current,in addition,the cables are evenly stressed.
作者 许健刚 魏美芳 Xu Jian’gang;Wei Meifang(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China)
出处 《港工技术》 2020年第2期27-29,共3页 Port Engineering Technology
关键词 曹妃甸 矿石码头 平面布置 优化设计 Caofeidian ore terminal plane layout design optimization
  • 相关文献

同被引文献17

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部