期刊文献+

基于CIVIL 3D的防波堤工程量计算分析 被引量:4

Calculation and Analysis of Breakwater Quantities Based on CIVIL 3D
下载PDF
导出
摘要 本文基于CIVIL 3D建立某海外港口防波堤模型,解决在原有防波堤基础上新建防波堤后的工程量计算问题。本文将介绍整个建模过程和思路,通过软件分析得到新建防波堤的精准工程量,并通过构建原有防波堤BIM模型对比实际已建防波堤的工程量验证模型的正确性,最后通过对比传统防波堤计算方法表明基于CIVIL 3D软件的BIM建模更加精准有效。 Based on CIVIL 3D,a breakwater model for an overseas port is built in order to calculate the quantities of a new breakwater constructed on the original breakwater foundation.The whole modeling process and idea are introduced in detail.The precise quantities of the new breakwater can be obtained through software analysis,BIM model of the original breakwater can be built to compare with the actual quantities of the new breakwater,which verifies the accuracy of the model.By comparing with the traditional calculation method,BIM model based on CIVIIL 3D software is more accurate and effective.
作者 邹建强 樊亮亮 Zou Jianqiang;Fan Liangliang(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou Guangdong 510230,China)
出处 《港工技术》 2020年第2期39-40,64,共3页 Port Engineering Technology
关键词 防波堤 CIVIL 3D 工程量 BIM模型 breakwater CIVIL 3D quantities BIM model
  • 相关文献

参考文献1

共引文献4

同被引文献41

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部