摘要
本文基于CIVIL 3D建立某海外港口防波堤模型,解决在原有防波堤基础上新建防波堤后的工程量计算问题。本文将介绍整个建模过程和思路,通过软件分析得到新建防波堤的精准工程量,并通过构建原有防波堤BIM模型对比实际已建防波堤的工程量验证模型的正确性,最后通过对比传统防波堤计算方法表明基于CIVIL 3D软件的BIM建模更加精准有效。
Based on CIVIL 3D,a breakwater model for an overseas port is built in order to calculate the quantities of a new breakwater constructed on the original breakwater foundation.The whole modeling process and idea are introduced in detail.The precise quantities of the new breakwater can be obtained through software analysis,BIM model of the original breakwater can be built to compare with the actual quantities of the new breakwater,which verifies the accuracy of the model.By comparing with the traditional calculation method,BIM model based on CIVIIL 3D software is more accurate and effective.