摘要 高桩码头桩基沉降会对上部结构内力产生一定的影响,但是通常情况下并不进行计算。为了确定码头桩基沉降量,本文结合工程实例,用了理论计算和数值模拟两种方法对桩基沉降进行了计算。结果表明,高桩码头整体沉降大概为几十毫米,不均匀沉降为几毫米。通过对两种计算方法进行对比得出,理论计算更加贴近实际情况,可以作为一种桩基沉降计算的有效方法。 The pile foundation settlement may cause a significant impact on the internal force of the upper structure of piled berth structure,which is not commonly included in the calculation.In order to determine the amount of pile foundation settlement,the theoretical calculation and the numerical simulation are applied in the settlement calculation respectively based on a specific project.The results show that the whole structural settlement is approx.dozens of millimeters and the differential settlement is about several millimeters.The comparative analysis of the two methods indicates that the theoretical calculation result closely approximates to the real-measured data,thus the theoretical calculation can serve as an effective method for calculating the pile foundation settlement.
作者 周子乐 何明伟 Zhou Zile;He Mingwei(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China)
出处 《港工技术》 2020年第2期107-110,共4页 Port Engineering Technology
关键词 高桩码头 桩基沉降 分层总和法 数值模拟 港口工程 piled berth structure pile foundation settlement layer-wise summation method numerical simulation port engineering
  • 相关文献

参考文献1

二级参考文献2

共引文献2

同被引文献6

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部