大跨度连续钢桁结合梁设计研究 被引量:10

Research on Design of Large Span Continuous Steel Truss Composite Bridge
下载PDF
导出
摘要 连续钢桁结合梁设计中,施工步骤、钢混弹模比、预拱度设置等都是影响最终成桥状态结构受力的关键因素。结合郑济铁路跨黄河北大堤(73+139+73)m连续钢桁结合梁的工程实践,重点对以上几个关键因素进行对比分析。研究表明,在钢桁结合梁的设计中,通过合理安排顶落梁、混凝土桥面板与钢桁梁结合、纵横向预应力张拉等主要施工顺序,可以使桥梁结构受力实现最优。应根据结构形式、施工过程等综合选取钢混弹模比(简单取大值不一定保守)。最后,根据结构力学虚功原理,结合自编程序,解决了大跨度连续钢桁梁的预拱度设置问题。 In the design of continuous steel truss composite beam,the key factors affecting the finished bridge state include construction steps,elastic modulus ratio of steel to concrete and pre-camber setting.Based on engineering practice of(73+139+73)m continuous steel truss composite bridge which strides across the Yellow River North Embankment in Zhengzhou-Ji’nan Railway,this paper focuses on comparing and analyzing the above key factors.Research shows that in the design,the construction sequence of the rising and falling girder,the combination of concrete bridge deck and steel truss girder,the prestressing tensioning should be reasonably arranged to optimize the bridge structural force.Elastic modulus ratio of steel to concrete should be selected according to the structure form and construction process(maybe it is not safer to simply select large values).According to the principle of virtual work combined with self-made program,the camber setting of large span continuous steel truss can be conveniently and efficiently solved.
作者 焦亚萌 金令 Jiao Yameng;Jin Ling(China Railway Engineering Design and Consulting Group Co.,Ltd.,Beijing 100055,China)
出处 《铁道勘察》 2020年第2期113-117,共5页 Railway Investigation and Surveying
基金 中国铁路总公司科技开发计划重大课题(2017G006-H)。
关键词 连续钢桁梁 施工步骤 弹模比 预拱度 铁路桥 Continuous steel truss girder Construction steps ratio of elastic modulus camber Railway bridge
  • 相关文献

参考文献10

二级参考文献89

共引文献132

同被引文献116

引证文献10

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部