摘要
文章着重介绍万家口子溢流坝铰支大梁承重支模体系的设计及混凝土施工过程。阐述提供确保施工安全和工程质量,缩短工期加快施工进度,节约施工成本的主要技术措施,为类似工程积累了可借鉴的施工经验。
This paper mainly introduces the design and concrete construction process of the bearing formwork system of the hinged girder of Wanjiakouzi overflow dam. This paper expounds the main technical measures to ensure the construction safety and quality, shorten the construction period, accelerate the construction progress, and save the construction cost, so as to accumulate the construction experience for similar projects.
作者
罗雄兵
LUO Xiongbing(China Energy Engineering Group Guangxi Hydroelectric Construction Bureau Co.,Ltd.,Nanning,Guangxi,530001)
出处
《红水河》
2020年第2期41-44,共4页
Hongshui River
关键词
大截面
大跨度
高净空
承重大梁
混凝土浇筑
large section
long span
high clearance
bearing girder
concrete placing