摘要 文章着重介绍万家口子溢流坝铰支大梁承重支模体系的设计及混凝土施工过程。阐述提供确保施工安全和工程质量,缩短工期加快施工进度,节约施工成本的主要技术措施,为类似工程积累了可借鉴的施工经验。 This paper mainly introduces the design and concrete construction process of the bearing formwork system of the hinged girder of Wanjiakouzi overflow dam. This paper expounds the main technical measures to ensure the construction safety and quality, shorten the construction period, accelerate the construction progress, and save the construction cost, so as to accumulate the construction experience for similar projects.
作者 罗雄兵 LUO Xiongbing(China Energy Engineering Group Guangxi Hydroelectric Construction Bureau Co.,Ltd.,Nanning,Guangxi,530001)
出处 《红水河》 2020年第2期41-44,共4页 Hongshui River
关键词 大截面 大跨度 高净空 承重大梁 混凝土浇筑 large section long span high clearance bearing girder concrete placing
  • 相关文献

参考文献2

二级参考文献1

  • 1建筑资料管理规程(DBJ01-51-2003).

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部