摘要
以金域蓝湾1#、6#楼项目为例,论文主要通过对外墙岩棉保温体系施工过程中原材料质量控制、洞口岩棉板套裁使用、锚栓选择及安装、平整度控制等措施,解决岩棉板外墙保温的质量通病,提高施工质量,保证外墙保温的使用安全。为同类工程施工提供参考。
With Golden Field Blue Bay 1#,6#building project as an example,this paper mainly through the external wall rock wool insulation system construction in the process of raw material quality control,the mouth of the cave rock wool board,choice of anchor bolt and the set of cutting and use the installation and flatness control,solve the quality common fault of rock wool board exterior wall insulation,improve the quality of construction,ensure the safety of the use of exterior wall thermal insulation.It can provide reference for similar projects.
作者
米万东
MI Wandong(Lanzhou Erjian Group Jianxin Engineering Co.,Ltd.,Lanzhou Gansu 730030,China)
出处
《工程质量》
2020年第3期90-93,共4页
Construction Quality
关键词
岩棉板外保温
施工过程
质量控制
external insulation of rock wool board
construction process
quality control