摘要 以通过巴拿马运河第四大桥工程为例,结合项目高地震烈度、大跨等特点,总结了项目东主塔扩大基础和西主塔桩基基础施工技术要点,详细介绍了咬合桩支护、扩大基础施工、栈桥平台设计及施工、锁扣钢管桩围堰施工、桩基及承台施工,为类似高地震烈度地区超宽超大跨斜拉桥主塔基础施工提供参考。 Taking the fourth Panama Canal Bridge project as an example, combined with the characteristics of high seismic intensity and large span, the paper summarizes the key points of the construction technology of the expanded foundation of the east main tower and the pile foundation of the west main tower, and introduces in detail the support of the occluded pile, the construction of the expanded foundation, the design and construction of the trestle platform, the construction of the cofferdam of the locked steel pipe pile, the construction of the pile foundation and the pile cap. It provides a reference for the construction of main tower foundation of super wide and super long span cable-stayed bridge in similar high seismic intensity area.
作者 唐子其 TANG Zi-qi(China Harbour Engineering Company Limited,Beijing 100027,China)
出处 《工程建设与设计》 2020年第7期198-199,205,共3页 Construction & Design for Engineering
关键词 高地震烈度 主塔基础施工 巴拿马运河第四大桥 high seismic intensity foundation construction of main tower the fourth Panama Canal Bridge
  • 相关文献

参考文献3

二级参考文献22

共引文献53

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部