摘要
以某市市内环线汉江桥为基本背景,针对其中的大节段钢箱梁施工展开探讨,该处施工环境较为复杂,难度相对较大,综合考虑到钢箱梁施工质量与成本要求,采用了滑移与散拼技术,将其应用于实际工程中,取得良好的效果,具有一定的参考价值。
Taking Hanjiang Bridge as the basic background, this paper discusses the construction of large section steel box girder. The construction environment is relatively complex and difficult. Considering the construction quality and cost requirements of steel box girder,the sliding and loose splicing technology is adopted, which is applied to the actual project, and has good effect, with certain reference value.
作者
宪光侨
XIAN Guang-qiao(China Communications 2nd Navigational Bureau 2nd Engineering Co.Ltd.,Chongqing 401121,China)
出处
《工程建设与设计》
2020年第7期214-216,共3页
Construction & Design for Engineering
关键词
大节段钢箱梁
运输及匹配
方案比选
large section steel box girder
transportation and matching
scheme comparison