摘要
虽然异步施工技术在A形或H形主塔施工中有过应用,但在实际施工中采取的措施有很大差异。准格尔黄河特大桥为主跨440m的双塔双索面斜拉桥,8#主塔采用A形混凝土塔,并设置4道横梁,下横梁与塔柱采用异步施工技术。论文结合该工程实例,针对斜拉桥A形主塔下横梁与塔柱异步施工技术进行分析。
Although asynchronous construction technology has been used in the construction of A-shaped or H-shaped main tower, the measures taken in the actual construction are quite different. Zhungeer Yellow River Super Large Bridge is a cable-stayed bridge with two towers and two cable planes with main span of 440 m. 8# main tower adopts A-shaped concrete tower, and 4 beams are set. Asynchronous construction technology is adopted for lower beam and tower column. Combined with the project example, the asynchronous construction technology of the lower crossbeam and column of the A-shaped main tower of the cable-stayed bridge is analyzed.
作者
于得安
姜永生
YU De-an;JIANG Yong-sheng(CCCC-SHEC Fifth Engineering Company Ltd.,Wuhan 430011,China)
出处
《工程建设与设计》
2020年第7期228-230,共3页
Construction & Design for Engineering
关键词
准格尔黄河特大桥
主塔
下横梁
异步施工
Zhungeer Yellow River Bridge
main tower
lower beam
asynchronous construction