准格尔黄河特大桥主塔与下横梁异步施工技术 被引量:2

Asynchronous Construction Technology of Main Tower and Lower Crossbeam of Zhungeer Yellow River Bridge
下载PDF
导出
摘要 虽然异步施工技术在A形或H形主塔施工中有过应用,但在实际施工中采取的措施有很大差异。准格尔黄河特大桥为主跨440m的双塔双索面斜拉桥,8#主塔采用A形混凝土塔,并设置4道横梁,下横梁与塔柱采用异步施工技术。论文结合该工程实例,针对斜拉桥A形主塔下横梁与塔柱异步施工技术进行分析。 Although asynchronous construction technology has been used in the construction of A-shaped or H-shaped main tower, the measures taken in the actual construction are quite different. Zhungeer Yellow River Super Large Bridge is a cable-stayed bridge with two towers and two cable planes with main span of 440 m. 8# main tower adopts A-shaped concrete tower, and 4 beams are set. Asynchronous construction technology is adopted for lower beam and tower column. Combined with the project example, the asynchronous construction technology of the lower crossbeam and column of the A-shaped main tower of the cable-stayed bridge is analyzed.
作者 于得安 姜永生 YU De-an;JIANG Yong-sheng(CCCC-SHEC Fifth Engineering Company Ltd.,Wuhan 430011,China)
出处 《工程建设与设计》 2020年第7期228-230,共3页 Construction & Design for Engineering
关键词 准格尔黄河特大桥 主塔 下横梁 异步施工 Zhungeer Yellow River Bridge main tower lower beam asynchronous construction
  • 相关文献

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部