期刊文献+

并行半导体生产线投料控制策略研究

Release Control Policy of Parallel Semiconductor Production Lines
下载PDF
导出
摘要 首先提出了一种基于主瓶颈设备利用率的并行半导体生产线投料控制策略(Release Control Policy Based on Bottleneck Equipment Utility,RCPBEU):分析投料与主瓶颈设备利用率之间的相关性;通过设定不同的仿真场景,确定主瓶颈设备利用率标准区间值,用于判断每卡待投料工件是否投进该生产线。随后,将瓶颈设备扩展到瓶颈加工区,提出了基于主加工区利用率的并行半导体生产线投料控制策略(Release Control Policy Based on Processing Area Utility,RCPPAU):采用试凑法确定主加工区利用率标准区间值;将主加工区与关系协同投料、主加工区或关系协同投料的方法在仿真系统上进行大量仿真。仿真结果表明,上述方法与固定在制品投料方法相比,出片量、加工周期、准时交货率、紧急工件准时交货率均能得到较大程度的改善。 This paper presents a release control policy for parallel semiconductor production line based on bottleneck equipment utility(BEU).The correlation between feeding and bottleneck equipment utilization is analyzed,the standard interval value of bottleneck equipment utilization is determined through setting different simulation scenarios and then determine whether feed each lot into the production line.Take bottleneck processing area into consideration,a release control policy for parallel semiconductor production line based on bottleneck processing area utility(BPAU)is proposed.The standard interval value of bottleneck processing area utilization is determined by trial and error method,and the release control policy is realized based on AND relationship of bottleneck processing area and the corresponding OR relationship.Compared with constant work in process(CONWIP)release control policy,the proposed release control policy can improve the performance by 2.47%,11.58%,19.75%and 17.07%in terms of throughout(TH),cycle time(CT),on-time delivery rate(ODR)and hot lot on-time delivery rate(HLODR).
作者 李莉 于青云 LI Li;YU Qing-yun(Department of Electronics and Information Engineering,Tongji University,Shanghai 201804,China)
出处 《控制工程》 CSCD 北大核心 2020年第3期409-417,共9页 Control Engineering of China
基金 国家自然科学基金面上项目(51475334)。
关键词 并行半导体生产线 投料控制策略 主瓶颈设备 主加工区 Parallel semiconductor production line release control policy bottleneck equipment bottleneck processing area
  • 相关文献

参考文献1

二级参考文献11

  • 1SPEARMAN M L,WOODRUFF D L,HOPP W J.CONWIP:a pull alternative to kanban[J].International Journal of Production Research,1990,28(5):879-894.
  • 2AURAND S S,MILLER P J.The operating curve:a method to measure and benchmark manufacturing line productivity[C] //Proceedings of IEEE/SEMI Advanced Semiconductor Manufacturing Conference.Washington,D.C,USA:IEEE,1997:391-397.
  • 3GLASSEY C R,MAURICIO G C.Closed-loop job release control for VLSI circuit manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,1988,1 (1):36-46.
  • 4LIU W,CHUA T J,CAI T X,et al.Practical lot release methodology for semiconductor back-end manufacturing[J].Production Planning & Control,2005,16 (3):297-308.
  • 5RYOHEI T,NOBUTADA F,KANJI U.Lot release control using genetics based machine learning in a semiconductor manufacturing system[C] //Proceedings of the 9th International Conference on Intelligent Autonomous Systems.Amsterdam,the Netherlands:IOS Press,2006:497-506.
  • 6CHUA T J,LIU M W,WANG F Y,et al.An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment[J].Robotics and Computer-Integrated Manufacturing,2007,23 (3):326-338.
  • 7HAN J,KAMBER M.Data mining:concepts and techniques[M].San Francisco,Cal.,USA:Morgan Kaufmann Publishers,2001:233-234.
  • 8HUANG Z.Extensions to the k-means algorithm for clustering large data sets with categorical values[J].Data Mining and Knowledge,Discovery,1998,2(3):283-304.
  • 9李大字,钱丽,靳其兵,谭天伟.改进的全局K′-means算法及其在数据分类中的应用[J].信息与控制,2011,40(1):100-104. 被引量:6
  • 10李友,江志斌,李娜,李程.晶圆制造系统投料策略综述[J].工业工程与管理,2011,16(6):108-114. 被引量:4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部