摘要
结合施工实例,对在运输和编组极为繁忙的铁路枢纽内进行营业线接触网增建绝缘锚段关节的施工技术方案及注意事项进行分析与阐述,以供类似工程借鉴。
Based on the construction example,this paper analyzes and expounds the construction technical scheme and precautions for the construction of insulated anchor joint of overhead contact system of business line in the railway hub with extremely busy transportation and marshalling,so as to draw lessons from similar projects.
出处
《建筑技术开发》
2020年第5期37-38,共2页
Building Technology Development
关键词
枢纽
接触网
增建
绝缘锚段关节
hub
catenary
additional construction
insulated anchor joint