电力工程造价管理在施工阶段中的控制策略分析 被引量:9

Analysis on Control Strategy of Power Engineering Cost Management in Construction Stage
下载PDF
导出
摘要 随着科技与电力工程建设的不断发展,电力工程规模逐步扩大,原材料价格上涨,对于电力建设项目的整个造价控制过程而言,电力工程的施工阶段是造价管理的重点环节,项目的大部分投资资金都在这一施工阶段被投入使用,项目投资多在这一阶段实现,因此施工阶段是造价控制最为复杂的阶段之一。主要围绕电力工程造价管理在施工阶段中的控制策略进行分析,以供参考。 With the continuous development of technology and power engineering construction,the scale of power engineering is gradually expanding,and the price of raw materials is rising.For the whole cost control process of power construction projects,the construction phase of power engineering is the key link of cost management.Most of the investment funds are put into use during this construction phase,and project investment is mostly realized at this stage,so the construction phase is one of the most complicated stages of cost control.This paper mainly analyzes the control strategy of power engineering cost management in the construction stage for reference.
作者 王亚奇 Wang Ya-qi
出处 《建筑技术开发》 2020年第4期90-91,共2页 Building Technology Development
关键词 电力工程 造价管理 施工阶段 控制策略 power engineering cost management construction stage control strategy
  • 相关文献

参考文献3

二级参考文献6

共引文献8

同被引文献18

引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部