摘要
攀钢集团矿业有限公司朱、兰采场及铁路排土场截排洪主体工程自1973年建成至今,已运行近半个世纪,经受住了安全考验,使用效果良好。本文对矿区截排洪设计及运行中一些问题的处理作了详细地阐述与分析,以期为类似工程设计提供借鉴与参考。
The main interception and drainage project in Waste Dump and lan,zhu stope from pangang group company have come into operation since 1973,which proved to have good security performance and effects. Elaboration and analysis of the solutions to issues come from design and operation of flood interception and drainage system is proposed,which is hoped to provide references for similar projects.
作者
朱建华
Zhu Jianhua(Hydraulic Engineering Technology Company,Zhongye Changtian International Engineering Co.yLtd.Changsha 410205,Hunan)
出处
《工程建设》
2020年第2期43-46,共4页
Engineering Construction
关键词
露天矿山
排土场
截排洪
防洪标准
surfaced mine
Waste Dump
flood interception and drainage
the standard of flood control