摘要 虚拟DCS仿真系统是基于NASPIC平台设计开发的,该系统用于模拟实际DCS系统中主控相关模块运行。为了验证虚拟DCS设计是否满足核电站相关性能要求,需要给虚拟DCS设计相应的核电厂模型数据接口。3KeyMaster是一个功能全面的图形化建模仿真平台,通过该平台可以与虚拟DCS进行数据交互。仿真结果表明,虚拟DCS能够正确获得来自于核电厂模型的数据,并且保证了时间同步性。 The virtual DCS simulation system is designed and developed based on NASPIC platform,this system is used to imitate the main control related modules in the actual DCS system.In order to verify whether the virtual DCS design meets the relevant performance requirements of nuclear power plants,it requires the design of data interface corresponding to nuclear power plant model and virtual DCS.3KeyMaster is a comprehensive thermal simulation analysis platform,it can construct data interaction with virtual DCS.Simulation results show that the virtual DCS can correctly obtain data from the nuclear power plant model,and ensure time synchronization.
作者 王恺 张旭 章雨 徐涛 姜静 刘明明 Wang Kai;Zhang Xu;Zhang Yu;Xu Tao;Jiang Jing;Liu Mingming(Science and Technology on Reactor System Design Technology Laboratory,Nuclear Power Institute of China,Chengdu,610213,China)
出处 《仪器仪表用户》 2020年第5期86-89,58,共5页 Instrumentation
关键词 虚拟DCS 3KeyMaster 数据接口 virtual DCS 3KeyMaster data interface
  • 相关文献

参考文献4

二级参考文献21

  • 1王立志,封官斌,翟永杰.虚拟DCS技术及实现[J].山东电力技术,2004,31(5):39-41. 被引量:10
  • 2郑福裕,傅晓东,蒋国兵.核电厂放射性监测系统仿真的数学物理模型[J].核科学与工程,1995,15(1):9-16. 被引量:1
  • 3段卫江.秦山300MW核电机组全范围仿真机放射性监测系统仿真[J].核动力工程,1996,17(2):156-160. 被引量:3
  • 4屈晓阳,邹刚.虚拟DCS开发及应用研究[J].燕山大学学报,2006,30(5):407-409. 被引量:7
  • 5Jae-Jun JEONG; Suk Ku SIM, Sang Yong LEE. Development and Assessment of the COBRA/RELAP5 Code [J]. Journal of Nuclear Science and Technology, 1997, 34 (11): 1087-1098.
  • 6Smith K A, Baratta A J, Robinson G E. Coupled RELAP5 and CONTAIN Accident Analysis Using PVM [J]. Nuclear Safety, 1995, 36(1): 94-108.
  • 7Anis Bousbia Salah, Giorgio M. Galassi, Francesco D'Auria et al. Assessment study of the Coupled Code RELAP5/PARCS Against the Peach Bottom BWR Turbine Trip Test [J]. Nuclear Engineering and Design, 2005, 235:1727-1736.
  • 8Carlson K E. RELAP5/MOD3.3 Code Manual Volume Ⅷ: Programmers Manual[R]. NUREG/CR-5535, 2001.
  • 9Geist A, Beguelin A, Dongarra J, et al. PVM 3 User's Guide and Reference Manual[R]. ORNL/TM-12187, 1994.
  • 10福建宁德核电有限公司.堆芯裂变产物积存量报告[R],核电站工程文件.2010.

共引文献27

同被引文献23

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部