摘要
根据国道310线郑州西南段改建工程SG03标段K57+562-K57+660段高填陡坡路基的施工经验,在选择填料、地基处理、填挖交界处理等施工要点和注意事项进行总结,保证了填筑质量,为高填陡坡路基施工提供相关参考。
According to the construction experience of the high-filled steep slope subgrade of K57+562-K57+660 section of SG03 section of Zhengzhou Southwest Section Reconstruction Project of National Highway 310,the construction points and precautions are summarized,such as selection of filler,foundation treatment,and fill-excavation junction treatment,which ensures the quality of the filling,and provides relevant reference for the construction of high-filled steep slope subgrade.
作者
程义强
CHENG Yi-qiang(The 3rd Engineering Co.,Ltd.of China Railway 17 Bureau Group Corporation,Shijiazhuang 050000,China)
出处
《价值工程》
2020年第10期146-148,共3页
Value Engineering
关键词
高填陡坡路堤
地基处理
沉降
填挖交界
high-filled steep slope subgrade
foundation treatment
settlement
junction of filling and digging