该文对佛山某电排站的CFG桩复合地基进行了案例分析,介绍了CFG桩软基处理设计计算、施工、检测和处理效果,并采用了不连续褥垫层的创新设计,减少了防渗措施,节约了资金,加快了施工进度,为类似水利工程设计、施工提供了较好的借鉴。
In this paper,the CFG pile composite foundation of a pumping station in Foshan was analyzed,and the design calculation,construction,detection and treatment effect of CFG pile soft foundation treatment are introduced.The innovative design of discontinuous cushion layer is adopted to reduce the anti-seepage measures,save money,speed up the construction,and provide a good reference for the design and construction of similar water conservancy projects.
作者
刘坚
刘红梅
LIU Jian;LIU Hongmei(Guangdong YSD Surveying&Designing Co.,Ltd,Foshan 528000,China)
出处
《广东水利水电》
2020年第4期77-83,共7页
Guangdong Water Resources and Hydropower
关键词
CFG桩
电排站
软基
褥垫层
创新设计
pumping station
CFG pile
soft foundation
cushion
innovative design