双江口水电站特高心墙堆石坝建设关键技术研究 被引量:9

Research on Key Techniques for the Construction of Ultra-high Core Wall Rockfill Dam in Shuangjiangkou Hydropower Station
下载PDF
导出
摘要 双江口水电站300 m级心墙堆石坝是世界在建的第一高坝,在可研阶段开展了坝基覆盖层及筑坝材料特性、防渗土料改性、坝体结构型式及分区方案、抗震安全评价及抗震措施、智能大坝管控系统等一系列关键技术研究,取得了丰富的研究成果。而随着工程建设的推进和技术的不断发展,还需在河床覆盖层建基条件、坝体结构分区及坝料特性、特高土石坝长期变形特性、高海拔冬季土料冻融规律及大坝防渗土料施工措施、特高坝安全监测等方面的关键技术进行深入研究,以保证工程的科学建设。 The 300 m level core wall rockfill dam in Shuangjiangkou Hydropower Station is the highest dam under construction in the world.In the feasibility study stage of the project,a series of researches have been carried out on the key construction techniques of such ultra-high dam,including the characteristics of the dam foundation overburden layer and dam construction materials,the modification of impervious soil materials,the dam structure type and zoning scheme,the seismic safety evaluation and resistance measures,and the intelligent dam management and control system.With the advancement of the project construction process and the continuous development of the engineering technology,further study on other key techniques is necessary to ensure a scientific construction of the project,including the foundation conditions of the riverbed overburden layer,the structural zoning and material characteristics of the dam,the long-term deformation characteristics of ultra-high embankment dam,the freezing-thawing characteristics of soil materials in winter and high altitude areas,the construction technique of impervious soil materials,and the safety monitoring of ultra-high dam.
作者 李鹏 LI Peng(China Guodian Dadu River Hydropower Development Co., Ltd., Chengdu 610041, China)
出处 《水电与新能源》 2020年第2期1-9,共9页 Hydropower and New Energy
关键词 双江口水电站 大坝建设 关键技术 综述 Shuangjiangkou Hydropower Station dam construction key techniques overview
  • 相关文献

参考文献3

二级参考文献4

共引文献25

同被引文献124

引证文献9

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部