摘要
根据全国洪水风险图编制背景及湖北省洪水风险图编制概况,全面总结湖北省洪水风险图编制工作及取得的进展,梳理集成过程中出现的问题和针对性的解决办法,以及洪水风险图工作中的经验体会,为进一步完善洪水风险图编制、加强管理应用系统的开发、集成与运行等提供更好的基础。
Firstly,the background of the national flood risk map compilation work is introduced.Then,the general situation and progress of the compilation work in Hubei Province are summarized.Problems and corresponding solutions in the integration of the flood risk maps are discussed and useful experience is summarized.It provides a solid foundation for the further improvement of the flood risk map compilation work,and the development,integration and operation of the management and application system.
作者
廖明
林江武
程雪
LIAO Ming;LIN Jiangwu;CHENG Xue(Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute, Wuhan 430064, China)
出处
《水电与新能源》
2020年第2期28-30,共3页
Hydropower and New Energy
关键词
洪水风险图
管理
应用系统
汇总集成
flood risk map
management
application system
summary and integration